参考文献:
[1] Levy, P. et al., “Organizational Strategy for CIM”, Computer-Integrated Manufacturing System, 1991,4.
[2] 国家科委科技司情报司, 航空航天部航天科技情报研究所, “美国国家关键技术”, 1991.9.
[3] M.Al-Salti and A.statham, “A Review of the Literature of the Use of SPC in Batch Production”, Quality and Reliability Engineering International. Vol.10, pp 49-61.
[4] 王永信,单件、小批加工质量统计分析方法的研究,西安交通大学,1991.
[5] George F.Koons, Jeffery J.Luner,SPC in Low-volume Manufacturing:A Case Study,J.of Quality Technology,vol.23,No.4,1991.
[6] Stephen V.Crowder, “An SPC Model for Short Production Runs:Minimizing Expected Cost”, Technometrics 1992.2 Vol.34 pp64-73.
[7] Patrica P.Ramsey, “Simple Tests of Normality in Small Samples”, Jounal of Quality Technology, 1990.10, Vol.22, pp 299-307.
[8] Shih-Yen Lin, “Short-Run Statistical Process Control:Multicriteria Part Family Formation”, Quality and Reliability Engineering International, 1997, Vol.13, pp 9-24.
[9] 郎志正,《质量控制方法与管理》,国防工业出版社,1989.5。
“面向AMT的统计过程质量控制*提供各类毕业论文!”版权归作者所有,转载请著名出处。